# The project quota that killed Shared VPC

> I designed a seven-project Google Cloud topology, then found out the billing account tops out at five, and a month of support tickets did not move it. What the collapse to four projects cost, and what it did not.

- Author: Deyan Peev (https://deyanpeev.com)
- Published: 2026-05-30
- Tags: Google Cloud, Terraform, Infrastructure as Code, Networking, Architecture, Migration
- URL: https://deyanpeev.com/posts/the-project-quota-that-killed-shared-vpc

The plan was a seven-project Google Cloud organisation. What's applied tonight
is four. The reason is a quota on a billing account, a support ticket that ran
for about a month, and in the end a decision to stop arguing and redraw the
diagram.

I'm writing it down because the conversation you have with yourself while
collapsing a design is more useful than the design, I think. Every layer I
deleted had a reason for existing. Some of those reasons survived the deletion
in another form and some turned out to have been ceremony.

# What I drew first

The product is moving off a platform-as-a-service and onto Google Cloud. It's a
containerised API, Postgres, a cache, a load balancer, three environments. The
foundation question is less "which compute" and more how many projects and where
the boundaries run, because on GCP the project *is* the boundary. IAM, quota,
billing attribution and the blast radius of a mistake all follow project lines.

So the folder tree I wrote into `bootstrap/folders.tf` looked like this:

```
oneclub/
  platform/
    admin/                  → oneclub-admin
    networking/
      oneclub-net-dev       host project, owns the dev VPC
      oneclub-net-staging   host project, owns the staging VPC
      oneclub-net-prod      host project, owns the prod VPC
    cicd/                   → oneclub-cicd
  workloads/
    development/            → oneclub-development   (service project)
    staging/                → oneclub-staging       (service project)
    production/             → oneclub-production    (service project)
```

Eight projects. It's close to what Google's own landing-zone material
suggests, and two decisions inside it matter here.

One is Shared VPC with dedicated host projects. In a Shared VPC topology
the network lives in a host project and the workload projects attach to it as
service projects. The VPC, subnets, firewall rules, Cloud NAT and the Private
Service Access range all belong to the host. Cloud SQL and Cloud Run live next
door in the workload project and consume the host network through cross-project
IAM. The payoff is that the people who own networking and the people who deploy
services can be different people, so you can grant `roles/compute.networkUser`
on a subnet without handing anyone the ability to draw new ones.

The other is a separate CI/CD project. Its job was Workload Identity
Federation and anything else automation-shaped (build triggers, custom build
images, deployment caches, CI-only secrets). I wrote the comment defending it
before I wrote the resource:

> Kept separate from `oneclub-admin` so that "what runs CI/CD" and "what manages
> the platform" have independent IAM and audit trails - the kind of split that
> pays off the first time a CI/CD compromise needs to be scoped without losing
> access to platform admin.

I still think that comment is right. I just didn't get to have it.

# The number is five

I did not know there was a number. I had used GCP before, inside organisations
where somebody else had long since dealt with this, and I had internalised
"projects are free, make as many as you need". That's true about *cost* and
false about *quota*.

New billing accounts come with a project limit, and the limit is small. Ours was
five projects on the billing account in total, not per folder or per
environment. My topology needed seven before the CI/CD project and eight with
it. And one of those five was already spent. There was a plain untidy project
from earlier in the year that we'd been using to try things out, sitting
outside the organisation entirely, billing about fourteen dollars a month.

So I did what you do. I requested an increase, explained the topology, and
attached the folder tree.

That request became a thread, and the thread ran for roughly a month. It wasn't
hostile and nobody ever said no in so many words. It was a sequence of
clarifying questions, each of which took days, each of which I answered, and
the quota was unchanged at the end of every round. At some point I stopped
opening it.

"Cloud support was slow" is a boring complaint, and it isn't the problem anyway.
**I let an open ticket block foundation work for a month.** The whole time, the
design I could build was available to me and I wasn't building it, because I
was waiting for permission to build a slightly better one. That is the mistake
in this story and it's mine, not Google's.

# Collapsing seven into four

Steady state is now:

| Role              | Project ID            |
| ----------------- | --------------------- |
| Admin / control   | `oneclub-admin`       |
| Workload: dev     | `oneclub-development` |
| Workload: staging | `oneclub-staging`     |
| Workload: prod    | `oneclub-production`  |

Four in the organisation plus the untidy legacy one makes five, and that is the
entire reason dev nearly didn't survive. For a while the plan was three
environments *or* dev, because I was one project short and dev is the one you
cut. Deleting the host-networking layer bought it back.

**The networking projects went away, and each workload project owns its own
standalone VPC.** Subnets, firewall, NAT and the PSA range now sit directly in
`oneclub-staging` and `oneclub-production` alongside the things that use them.
The module didn't care. `modules/vpc/` takes a single `project_id`, so
re-pointing an environment from a host project to its workload project is a
variable change.

The migration was much lighter than I had budgeted for, and the reason is
unglamorous. Shared VPC had never been enabled. The host projects existed, the
folders existed, but the environment VPCs had never been applied against them
and nothing consumed them. So what I expected to be a destroy-and-recreate
became a state reconciliation: `terraform state rm`, then `terraform import`
for the projects that already existed, then one apply to move them under
`workloads/`. A topology you haven't applied yet is free to change, and the
window where that's true is shorter than you'd think.

**The CI/CD project folded into admin.** The WIF pool and the GitHub OIDC
provider now live in `oneclub-admin` beside the Terraform state bucket and the
Artifact Registry repository. I do count this one as a loss. The audit trail for
"something deployed" and the audit trail for "something changed the platform"
are now the same trail, and an identity that can do one is a short IAM hop from
the other. What I have instead is narrower conditions on the federation itself.
The pool's provider is bound to one GitHub organisation, and each environment's
deployer service account is a separate identity that CI impersonates, so there
is no one account that can reach every environment. It's defence at a different
layer.

**Per-environment subfolders went too.** `workloads/development`,
`workloads/staging` and `workloads/production` existed so that future
per-environment projects (a data project, an AI project) would have somewhere
to land. With a five-project ceiling there are no future per-environment
projects, so three folders holding one project each are just indirection. The
workload projects now sit directly under `workloads/`.

## Separation of duties and the CIDR plan

The separation-of-duties argument is real, and it's the one I lost. At three
people it is also mostly theoretical, since the person who would have been
granted `networkUser` on a subnet is the person who drew the subnet.

The argument I thought I'd miss more is address-space governance, meaning one
place that owns the CIDR plan so environments can't overlap by mistake. Writing
the plan down solved that without a project owning it. The allocation lives in
`CLAUDE.md` and in three `terraform.tfvars` files:

- prod `10.0.0.0/16`, staging `10.1.0.0/16`, dev `10.2.0.0/16`
- inside each `/16`: app `/24`, serverless-connector `/28`, proxy-only `/24`,
  and a `/20` reserved for Private Service Access

Non-overlapping by construction, one `/16` per enviroment with enormous room,
and reviewable in a diff. A host project would have enforced this. At this size
a document plus code review enforces it too.

What I do lose is centralised VPC flow-log and firewall policy. It's three
networks to configure now instead of one. Flow logs are enabled on the app
subnet in all three environments because I remembered to do it three times,
and that's the kind of thing that stops being true later.

# The policies survived intact

What reconciled me to the smaller topology is that most of what I wanted the
project structure to guarantee is guaranteed by organisation policy instead,
applied once at the `oneclub` folder and inherited by every project under it:

```hcl
resource "google_org_policy_policy" "disable_sa_key_creation" {
  name   = "${local.oneclub_folder}/policies/iam.disableServiceAccountKeyCreation"
  parent = local.oneclub_folder

  spec {
    rules {
      enforce = "TRUE"
    }
  }
}
```

Alongside it: `compute.requireShieldedVm`, `storage.publicAccessPrevention`,
`sql.restrictPublicIp`, a deny-all on `compute.vmExternalIpAccess`, and
`run.allowedIngress` pinned to `internal-and-cloud-load-balancing`. Domain
Restricted Sharing is enforced organisation-wide by Google's own secure-by-default
posture for new organisations, so I don't declare it at all.

The first one is the one I keep coming back to.
`disableServiceAccountKeyCreation` means no JSON key can be minted anywhere
under the folder, including by me, in a hurry, "just for this one script". A
project boundary is a wall you can walk around with enough IAM, and an enforced
org policy is a wall that returns an error. Losing the CI/CD project hurts less
when the thing that project was mostly protecting against can't be created in
the first place.

Operator access follows the same logic. There's no VPN in this design and there
will not be one. Reaching a private Cloud SQL instance goes through IAP and the
Cloud SQL Auth Proxy, so every operator session is an IAM decision with a log
line and not a credential on a laptop. Combined with the external-IP deny-all,
there is no VM in the organisation that can be reached from the internet at all.

# Applied so far

`bootstrap/` is applied on the four-project model. The state bucket is
`1club-tf-state` with versioning and a five-generation retention rule. The
workload projects are Terraform-managed `google_project` resources, staging and
production with billing attached and development deliberately without, so it
costs nothing until there's a reason for it to. Standalone VPCs are applied in
staging and production. Dev's is written and not applied, waiting on billing.
Cloud NAT is up in staging. The WIF pool and the per-environment deployer service
accounts went in this afternoon.

Cleanup is still outstanding, and I'm listing it because unlisted cleanup
doesn't happen: the suspended `oneclub-net-*` host projects, the now-empty
`networking` and `cicd` folders, the three empty `workloads/*` subfolders, and
the auto-mode `default` VPCs that GCP creates in every new project and that
nothing should ever use. All of that gets destroyed through Terraform (import
it, mark it, apply) and not clicked away in the console, because a resource
deleted outside the state file comes back the next time somebody runs `apply`
from a stale checkout.

Everything is Terraform 1.15.3 against the Google provider in the `>= 7.32,
< 8.0` band, and every leaf directory is its own root with its own state prefix
in the same bucket. No compute exists yet. That's next.

# What I would tell someone starting

Find the quota, not just the cost, before you draw the diagram. That means the
billing account's project limit, the per-project quotas on whatever you're
about to use heavily, and the regional capacity for anything that isn't an
instance type you have used before. Half an hour reading limits pages would have
changed my first design instead of my second.

And when a request for an exception goes past a week, build the thing you are
allowed to build. I ended up with a topology with a slightly bigger blast radius
and a slightly weaker audit story, and I got it a month later than I needed it
because I kept arguing for seven projects.
